Mission Workplace

Office Fit Out Specialists

 

index1v2
 
  • index1v2
    Office Fit Out | Glazed Partitioning | Office Space Planning & Design
  • Commercial Office Furniture
    Office Fit Out | Glazed Partitioning | Office Space Planning & Design
  • Commercial Office Design
    Office Fit Out | Glazed Partitioning | Office Space Planning & Design
  • index2v4
    Office Fit Out | Glazed Partitioning | Office Space Planning & Design
  • index2v5
    Office Fit Out | Glazed Partitioning | Office Space Planning & Design

DR Centre
Case Study

 

DR CENTRE - BIRMINGHAM

 

Project Overview

Client:  DR Centre
Location:  Birmingham
Timescale:  2 weeks
Sector:  Disaster & Data Recovery

Scope Of Works

Transformation of exterior Planter area.
Removal of existing planter with provision of a new purpose built  planter solution which also provides instant hedge  screening for existing generators.

Project Scope :

Specific Criteria considerations:-

  • Site Survey to establish Health & Safety protocol for safe removal of existing Planter with heavy plant machinery & Hyab Deliveries
  • Initiate Programme of Works
  • Design Drawing provided detailing specification of new Planter illustrating bespoke cladding and new Hedging specifications
  • Structural considerations to ensure inner planter container wall strengths to hold substrate tonnage
  • Consideration to marshalling during  Hyab deliveries of Planter components within a nominated Fire Exit area
  • Maintenance Care Programme necessary for Planter, Hedging Plants and Shrubs provided

Removal of existing planter and constructed inner containers...........

Careful removal utilising JCB Mini Digger & Grab Hire Specialists.

Barrier provision to cordon area retaining a safe area as Fire Exit Staff point.

Safe marshalling of removal of existing Planter and Substrates.

Detailed Design to provide a bespoke Inner constructed container.

Strengthened inner section to give rigidity

Fully Galvanised and Zinc Plated

Instant Hegde Bespoke Planter............

Our client is delighted with the finished Planter which is fully clad is high grade Eco friendly timber with bevelled/eased edges.

Timber Cladding is virtually  splinter free  and specialist green pressure treated to ensure longevity.

Drainage Substrate added together with sand/top soil mix to aid drainage, finished in Bark with a fertilizer dressing.

Instant Hedging Plants were carefully selected to ensure excellent standard of maturity and fully shaped.  A Selection of accompanying smaller shrubs to the frontage of the planter adds to the established look.

A full irrigation system completes the Planter for easy watering together with a Maintenance and Care Programme.